Lichfield Garrick

Client:
Lichfield District Council
Total Project Cost: circa 5 million
Gross Floor Area: approximately 3,800 sq. m
Service: Mechanical & Electrical Building services design
Awards: CIBSE Project of the Year Award 2004
Green Apple Award 2002 for Environmental Best Practice
Constructing Excellence Award 2005
South Staffordshire Design Award 2005

Project Details:

Fresh air is supplied into the auditorium through three sides of the building through masonry builder's shafts and sheet metal ductwork. The air is tempered before being supplied into the auditorium through heating elements and grilles beneath the seating. Air is also supplied to the stage area through a ventilated cavity wall into the void below the stage.

Stale air is exhausted through large vent stacks sited over the auditorium with two large stacks over the stage and a single stack over the studio

1  2  3  4
EDP Consulting Limited  
246 Aylestone Lane   Wigston   Leicestershire   LE18 1BD   T: 0116 281 2422    F: 0116 257 8940    E: enquiry@edp-engineers.co.uk

Building Services Consulting Engineers