Sir Richard Morris Building - Phase II

Client:
Loughborough University
Total Project Cost: £3.2 million
Gross Floor Area: approximately 2,120 sq. m
Service: Mechanical & Electrical Building Services Design
Awards: Green Apple Award 2008
              North Region Bronze Winner

Project Details:

At night, with the building unoccupied, the dampers open allowing the cool external air to circulate through the building cooling the structure ready for the next day’s occupancy.
 
The whole system is monitored and controlled by the site wide Trend Building Management System.
 
The lighting scheme installed utilises highly efficient lamps and luminaires with dimming controls linked to daylight sensors and occupancy sensors in each space. These reduce the levels of artificial light and therefore energy consumed as the available daylight increases and switch off luminaires where rooms are vacated.
1  2  3  4
 
EDP Consulting Limited  
246 Aylestone Lane   Wigston   Leicestershire   LE18 1BD   T: 0116 281 2422    F: 0116 257 8940    E: enquiry@edp-engineers.co.uk

Building Services Consulting Engineers