New Sixth Form Centre, Stoke Park School

Client:
Coventry City Council
Total Project Cost: £3.3 million
Gross Floor Area: approximately 950 sq. m
Service: Mechanical, Electrical and Acoustic
Building Services Design

Project Details:

The building has been design to achieve BREEAM ‘Very Good’ status and utilizes ground source heat pump technology, single sided and cross flow natural ventilation techniques to teaching spaces, with mechanical ventilation to Music areas, toilets & the kitchenette. 

Air-conditioning is limited to the ICT Server Room. 

Lighting is by fluorescent luminaires with dimming high frequency controlgear, controlled by day light sensors, presence detectors and by manual controls from the teaching positions.